Tuesday, January 27, 2009

January 26, 2009

Tommy hung the projector briefly last night so we can get a preview of the screen size. It is large.



Monday, January 26, 2009

January 22, 2009

The contactor returned today for more mudding. He should finish up with the mudding and sanding on Monday, followed by the riser being constructed.




Wednesday, January 21, 2009

January 20, 2009

The drywall hanging began today.

This is facing what will eventually be the screen.
This is facing the seating area.


This is standing outside the theater room facing it.


January 19, 2009

Today the drywall was delivered, and the contractor installed part of the insulation.













Tuesday, January 13, 2009

Electrical weekend

Hi everyone -

Nothing much to post lately, except the Electrician came out all day Saturday, all day Sunday, and finally finished up Monday night. So, I refrained from taking photos, since all that has changed is the blue electrical boxes have appeared, and I didn't find that exciting enough to warrant photos.

But, the contractor should return this week to build the tier for the raised seating in the home theater.

Next up after that: insulation!

Stay tuned.

Friday, January 9, 2009

January 8, 2009

Great progress on the home theater.

Here we've got what will eventually be the wall on which the screen will be placed.

The doorway on the left will be French doors leading to the theater room itself. The door on the right to the "man behind the curtain" room where all the wires and electronics will live.



Wednesday, January 7, 2009

January 7, 2009

The contractor came today and framed so much he ran out of lumber. He'll be back Thursday with some more materials to finish up the framing.

Here's the back wall of the wine cellar, as seen through the storage area.


The bathroom on the left, the sump-pump room on the right.


The home theater taking shape.