Tuesday, January 13, 2009

Electrical weekend

Hi everyone -

Nothing much to post lately, except the Electrician came out all day Saturday, all day Sunday, and finally finished up Monday night. So, I refrained from taking photos, since all that has changed is the blue electrical boxes have appeared, and I didn't find that exciting enough to warrant photos.

But, the contractor should return this week to build the tier for the raised seating in the home theater.

Next up after that: insulation!

Stay tuned.

Friday, January 9, 2009

January 8, 2009

Great progress on the home theater.

Here we've got what will eventually be the wall on which the screen will be placed.

The doorway on the left will be French doors leading to the theater room itself. The door on the right to the "man behind the curtain" room where all the wires and electronics will live.



Wednesday, January 7, 2009

January 7, 2009

The contractor came today and framed so much he ran out of lumber. He'll be back Thursday with some more materials to finish up the framing.

Here's the back wall of the wine cellar, as seen through the storage area.


The bathroom on the left, the sump-pump room on the right.


The home theater taking shape.




Tuesday, January 6, 2009

January 5, 2009

The contractor returned today (Monday) to continue the framing, and began walling off some of the smaller rooms.

Here we have the sump-pump room, with doorway.

Side view of the sump-pump room.


And finally the door to the eventual wine cellar.


Monday, January 5, 2009

January 3, 2009

The electrician came out for a few hours today to install more lighting. Now that it's so much brighter than before, it feels a lot smaller than it used to. A few more lights need to be installed, and then the electrician is done until the framing is complete.

Saturday, January 3, 2009

January 2, 2009

The contractor came over today to deliver the rest of the lumber and begin framing. We have walls forming!

Also the electrician was over to install the can lights. He comes back on the 3rd to finish that up and install a new circuit box, since there will be lots of electronic equipment in the basement when all is said and done.